The most anticipated vande Bharat train that connects Sri Mata Vaishno Devi Kathra (SVDK) Station in Jammu and Srinagar in Kashmir is likely to be flagged this month.
One step News 18 The Vande Bharat train from Kadra to Kashmir will run from February 17, 2025.
It is said that Prime Minister Narendra Modi will open the road from Kadra.
Following the inauguration, Vande Bharat service will work directly between Kadra and Srinagar.
The Indian Railways recently conducted a successful test drive on the Katra-Panihal railway corridor.
With this growth, the Wande Bharat train will become the first semi -speed service in the Kashmir Valley and the third train in the Union Territory of Jammu and Kashmir.
Introducing this service will help passengers from New Delhi to Srinagar.
It is said that the Vante Bharat train, which runs under the Northern Railway (NR) zone, will have an orange and brown color project.
Indian Railways has also released tables of three trains, including Bharat Service.
The new service will reduce travel time, which will allow passengers to reach Srinagar from Kadra in three hours.
The ticket price for the travel has not yet been finalized.
The Vande Bharat Train is specially designed to withstand the extreme cold weather.
Advanced frost resistance systems are fitted to ensure smooth operation in severe winter weather.
Unlike other Vande Bharat trains, this model is designed to operate efficiently at low temperatures up to 20 degrees Celsius.
The train contains advanced heat mechanisms to maintain the passengers’ convenience during the trip.
The driver’s cabin is fitted with a hot windshield, preventing fog or freezing to clear choice.
To prevent frost, the train’s plumbing and bio-toilets are fitted with thermal components, working essential systems even in severe winter situations.