Inurils, the overhaul of the Federal program’s overhaul launched an overhaul of the Federal program “school educational systems.” Currently, 40% of the work of the work, electrical wiring has already been replaced in two floors.
The city and contractor and contractor were negotiated with the schedule of repair events. Without the framework of the project, it has been planned to replace windows, change the windows, change the talents, heating, water supply, sanitation and power supply. The development of the interior design will participate in a pedagogical team, parents and students, so it reflects the features of each class.